Project No. | Project Title | Start Date | Estimated
Annual Emission Reductions |
Methodology | Length of
Crediting period |
PDD/ PoA-DD |
Validation,
Verification & Certification Reports |
---|---|---|---|---|---|---|---|
CCL001 | Installation of Cogeneration plant by utilizing the Biomass based Boiler with a capacity of 20 TPH at BIDCO Oil Refineries Limited, Kenya | 01/01/2012 | 53,034 | AMS-I.C - Thermal energy production with or without electricity | 10 years | ![]() |
![]() |
CCL002 | Replacement of Fossil Fuel by Biomass in a Crude Palm Oil (CPO) Refinery at BIDCO’s Thika facility in Kenya | 01/01/2012 | 23,827 | AMS-I.C - Thermal energy production with or without electricity | 10 years | ![]() |
![]() |
CCL003 | Replacement of Fossil Fuel by Biomass in a Crude Palm Oil (CPO) Refinery at BIDCO’s Dar es Salaam Facility in Tanzania | 01/01/2012 | 17,345 | AMS-I.C - Thermal energy production with or without electricity | 10 years | ![]() |
![]() |
CCL004 | Replacement of Fossil Fuel by Agricultural Residues to Power a Crude Palm Oil (CPO) Refinery at BIDCO’s Jinja facility in Uganda | 01/01/2012 | 28,908 | AMS-I.C - Thermal energy production with or without electricity | 10 years | ![]() |
![]() |
CCL008 | Cogeneration and/or trigeneration at commercial sites | 07/11/2011 | 15,284 | AMS II.K.. - Installation of co-generation or tri-generation systems supplying energy to commercial building | 28 Years | ![]() |
![]() |
CCL011 | Prieska Grid Connected 20 MW Solar Park, South Africa | 02/01/2013 | 38,081 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.1.0 | 10 years | ![]() |
![]() |
CCL013 | Hopefield Wind Energy Facility in South Africa | 06/03/2012 | 153,608 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources - Version 12.1.0 , Sectoral Scope: 1 | 10 years | ![]() |
![]() |
CCL021 | Landfill Gas Utilisation Programme of South Africa | 05/01/2012 | 48,881 | ACM0001: Consolidated baseline and monitoring methodology for landfill gas project activities, Version: 11.0, Sectoral Scope: 13 | 28 Years | ![]() |
![]() |
CCL023 | Waste energy to electricity at ArcelorMittal’s Vanderbijlpark Steel, South Africa | 01/01/2012 | 252,925 | ACM 0012- Consolidated baseline methodology for GHG emission reductions from waste energy recovery projects, Version 0.4.0, Sectoral Scope: 1 & 4 | 10 years | ![]() |
![]() |
CCL024 | Small-scale solar electrical programme, South Africa | 12/22/2011 | 11,684 | AMS-I.F.: Renewable electricity generation for captive use and mini-grid --- Version 2.0, Scope: 1 AMS-I.D: Grid connected renewable electricity generation --- Version 17.0, Scope: 1 | 28 Years | ![]() |
![]() |
CCL025 | South African Grid Connected Wind Farm Programme | 10/26/2011 | 23,368 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources - Version 12.1.0 , Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL026 | South African Large Scale Grid Connected Solar Park Programme | 04/05/2012 | 67,941 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version -12.3.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL028 | Kenya Improved woodstoves project | 04/01/2012 | 49,230 | AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass - Version 3.0, Sectoral Scope: 3 | 28 Years | ![]() |
![]() |
CCL029 | Silicon Smelters Energy Efficiency Improvement Project (Furnace F) | 08/01/2012 | 22,749 | AM0038: Methodology for improved electrical energy efficiency of an existing submerged electric arc furnace used for the production of silicon and ferro alloys Version: 3, Sectoral Scope: 9 | 10 years | ![]() |
![]() |
CCL031 | Efficient Natural Gas Based Electricity Generation at Hrazdan TPP Unit No.5 | 03/01/2012 | 699,507 | AM0029: Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas , Version: 3.0, Sectoral Scope:1 | 10 years | ![]() |
![]() |
CCL034 | The Consteel energy efficiency project at Cape Gate, South Africa | 01/01/2012 | 20,751 | AMS-II.D. - Energy efficiency and fuel switching measures for industrial facilities -Version 12.0, Sectoral Scope: 4 | 10 years | ![]() |
![]() |
CCL035 | Springbok Grid Connected 55.5 MW Wind Farm, South Africa | 06/01/2013 | 128,733 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.1.0 | 10 years | ![]() |
![]() |
CCL036 | De Aar Grid Connected 100.5 MW Wind Farm, South Africa | 10/01/2013 | 227,892 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.1.0 | 10 years | ![]() |
![]() |
CCL037 | CarbonSoft Open Source PoA, LED Lighting Distribution: Pan Africa | 10/10/2011 | 41,850 | AMS-III.AR. ver. 3 - Substituting fossil fuel based lighting with LED/CFL lighting systems | 28 Years | ![]() |
![]() |
CCL038 | NuPlanet Small Scale Hydropower PoA | 04/10/2012 | 18,175 | AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL040 | African Clean Energy Switch – Biogas (ACES-Biogas) | 01/01/2012 | 54,436 | AMS-I.E.: Switch from Non-Renewable Biomass for Thermal Applications by the User , Version: 4.0 , Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL044 | Transfer mechanism – Introduction of Vertical Shaft Brick Kiln (VSBK) Technology at Vhavenda Brick – South Africa | 01/01/2013 | 26,052 | AMS-III.Z.: Fuel Switch, process improvement and energy efficiency in brick manufacture, Version: 3.0, Sectoral Scope: 4 | 10 years | ![]() |
![]() |
CCL045 | Ecoprial Methane emissions avoidance project | 08/01/2012 | 11,730 | AMS-III.F.: Avoidance of methane emissions through composting --- Version 10.0, Scope: 13 | 10 years | ![]() |
![]() |
CCL049 | Sustainable Promotion of East African Renewables (SPEAR) | 12/01/2011 | 4,800 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.2.0, Scope: 1 | 28 Years | ![]() |
![]() |
CCL050 | Project to replace fossil fuel based lighting with Solar LED lamps in Africa | 01/01/2012 | 25,272 | AMS-III.AR: Substituting fossil fuel based lighting with LED lighting systems -Version: 1.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL052 | Coal Mine Methane Utilisation and Destruction Programme in DPR Korea | 10/22/2011 | 143,049 | ACM0008: Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation --- Version 7.0, Sectoral Scope: 8 & 10 | 28 Years | ![]() |
![]() |
CCL058 | Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa | 07/01/2015 | 369,563 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 13.0, Scope: 1 | 7 Years | ![]() |
![]() |
CCL060 | Kathu Grid Connected 100 MW Solar Park, South Africa | 03/01/2014 | 190,407 | ACM0002-Consolidated baseline methodology for grid-connected electricity generation from renewable sources, Version: 13.0, Sectoral Scope: 1 | 7 Years | ![]() |
![]() |
CCL062 | Langa Energy Photovoltaic Solar Energy Facility, South Africa | 07/01/2013 | 134,310 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.2.0, Scope: 1 | 10 years | ![]() |
![]() |
CCL070 | Dorper Wind Energy Facility | 06/01/2012 | 1,010,698 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources biomass - Version: 12.0, Sectoral Scope: 1 | 7 Years | ![]() |
![]() |
CCL071 | Indwe Wind Project | 06/01/2012 | 154,833 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources biomass - Version: 12.0, Sectoral Scope: 1 | 7 Years | ![]() |
![]() |
CCL072 | Clinker Optimization in cement types production at Derba MIDROC cement plant | 03/01/2012 | 576,029 | ACM0005: Increasing the blend in cement production --- Version 6.0.0, Scope: 4 | 7 Years | ![]() |
![]() |
CCL074 | Hydro Electrical Power Plant Rio Huasco Project | 04/01/2012 | 20,194 | AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Scope: 1 | 7 Years | ![]() |
![]() |
CCL075 | Hydro electrical power plant Allipén | 06/01/2012 | 8,944 | AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Scope: 1 | 7 Years | ![]() |
![]() |
CCL076 | Power Generation from biogas in Windhoek, Namibia | 01/01/2013 | 9,082 | AMS-I.C.: Thermal energy production with or without electricity --- Version 19.0, Scope: 1 AMS-III.H.: Methane recovery in wastewater treatment --- Version 16.0, Scope: 13 | 10 years | ![]() |
![]() |
CCL077 | The Capture, Destruction and Utilisation of Mine Methane at the Beatrix West Shaft in South Africa | 01/01/2013 | 161,642 | AM0064: Capture and utilisation or destruction of mine methane (excluding coal mines) or non mine methane --- Version 3.0.0, Scope: 10 | 10 years | ![]() |
![]() |
CCL078 | Neusberg Grid Connected Hydroelectric Power Plant, South Africa | 10/08/2014 | 66,826 | AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Sectoral Scope: 1 | 7 Years | ![]() |
![]() |
CCL086 | Chilean Small Scale Renewable Energy Programme of Activities (PoA) | 04/16/2012 | 16,153 | AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL087 | Chilean Programme of Activities for Integrated Non Conventional Renewable Energies | 04/26/2012 | 170,659 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.3.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL093 | Red Cap Kouga Wind Farm | 04/06/2014 | 305,220 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.2.0, Scope: 1 | 10 years | ![]() |
![]() |
CCL097 | CarbonSoft Open Source PoA, LED Lighting Distribution: Oceania | 12/22/2011 | 44,183 | AMS-III.AR.: Substituting fossil fuel based lighting with LED/CFL lighting systems --- Version 2.0, Scope: 1 | 28 Years | ![]() |
![]() |
CCL101 | Biomass Renewable Energy Programme of Activities | 04/24/2012 | 914,230 | ACM0006: Consolidated methodology for electricity and heat generation from biomass residues --- Version 12.0.1, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL105 | Río Luis | 01/01/2015 | 51,517 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.2.0, Scope: 1 | 10 years | ![]() |
![]() |
CCL107 | De Aar Grid Connected 10 MW Solar Park, South Africa | 10/01/2013 | 19,041 | AMS-I.D.: Grid connected renewable electricity generation, Version: 17.0, Sectoral Scope: 1 | 7 Years | ![]() |
![]() |
CCL108 | Llay Llay Wind Farm Project | 01/01/2014 | 101,066 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.3.0, Scope: 1 | 7 Years | ![]() |
![]() |
CCL109 | Atacama Solar Photovoltaic Power Plant Project | 04/01/2013 | 262,000 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.3.0, Scope: 1 | 7 Years | ![]() |
![]() |
CCL111 | Electricawinds 30 MW Wind Project at Riverbank | 12/01/2013 | 95,099 | ACM0002 Version 13.0.0 : “Consolidated baseline methodology for grid-connected electricity generation from renewable sources” | 7 Years | ![]() |
![]() |
CCL115 | Energy Efficiency of Nigeria’s Residential Lighting Stock by Distributing up to 40 Million Compact Fluorescent Lamps (CFLs) to Residential Households Connected to the National Grid | 12/01/2012 | 258,860 | AMS-II.J, Demand-side activities for efficient lighting technologies, version 4 | 10 years | ![]() |
![]() |
CCL121 | City of Cape Town Treatment of Organic Waste Streams CDM Projects | 07/01/2013 | 21,434 | AM0025: “Avoided Emissions from organic waste through alternative waste treatment processes” (Version 14.0.0) ; Sectoral Scope 13 | 28 Years | ![]() |
![]() |
CCL122 | City of Cape Town Landfill Gas Extraction and Utilisation Programme | 11/28/2011 | 128,218 | ACM0001: Flaring or use of landfill gas --- Version 12.0.0, Sectoral Scope: 13 | 28 Years | ![]() |
![]() |
CCL131 | Methane recovery and power generation at the Kupferberg Landfill in Namibia | 01/01/2013 | 22,208 | AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Sectoral Scope: 1 AMS-III.G.: Landfill methane recovery --- Version 7.0, Sectoral Scope: 13 | 10 years | ![]() |
![]() |
CCL132 | Bokpoort CSP (Concentrating Solar Power) Project, South Africa | 07/01/2015 | 230,537 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version12.3.0, Scope: 1 | 10 years | ![]() |
![]() |
CCL133 | Capture and combustion of Methane in coal mines | 12/31/2012 | 180,514 | ACM0008: Consolidated methodology for coal bed methane, coal mine methane and ventilation air methane capture and use for power (electrical or motive) and heat and/or destruction through flaring or flameless oxidation --- Version 7.0, Sectoral Scope: 8 & 10 | 28 Years | ![]() |
![]() |
CCL134 | Organic waste composting programme of activities | 12/01/2012 | 505 | AM0025: Avoided emissions from organic waste through alternative waste treatment processes --- Version 13.0.0, Sectoral Scope: 1,13 | 28 Years | ![]() |
![]() |
CCL139 | Regional Biogas PoA | 12/31/2012 | 29,280 | AMS-III.H.: Methane recovery in wastewater treatment --- Version 16.0, Sectoral Scope: 13 AMS-I.C.: Thermal energy production with or without electricity, Version: 19.0, Sectoral Scope: 1 AMS-I.F.: Renewable electricity generation for captive use and mini-grid --- Version 2.0, Sectoral Scope: 1 AMS-I.D.: Grid connected renewable electricity generation --- Version 17.0, Sectoral Scope: 1 AMS-I.A.: Electricity generation by the user --- Version 14.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL146 | Solar LED Lamp Project in Developing Asia | 12/01/2012 | 7,772 | III.AR.: Substituting fossil fuel based lighting with LED/CFL lighting systems , Version: 2.0, Sectoral Scope: 1 | 28 Years | ![]() |
![]() |
CCL151 | Golden Sugar 30MW High Energy Efficient Combined Heat and Power (CHP) System in Apapa, Lagos, Nigeria | 07/01/2012 | 72,553 | AM0102: version 01.0.0 : Greenfield cogeneration facility supplying electricity and steam to a Greenfield Industrial Consumer and exporting excess electricity to a grid and/or project customer(s) | 7 Years | ![]() |
![]() |
CCL152 | Solar PV Project in Dominican Republic | 01/01/2013 | 43,568 | ACM0002: Consolidated baseline methodology for grid-connected electricity generation from renewable sources --- Version 12.3.0, Scope: 1 | 10 years | ![]() |
![]() |
CCL153 | Methane avoidance in closed landfill and/or individual cells Programme of Activity | 12/01/2012 | 51 | AMS-III.AX.: Methane oxidation layer (MOL) for solid waste disposal sites --- Version 1.0, Sectoral Scope: 13 | 28 Years | ![]() |
![]() |
CCL161 | Replacement of electric heater with steam heater | 08/12/2011 | 2,676 | AMS - II.D " Energy Efficiency and fuel switching measures for industrial facilities" | 10 years | ![]() |
![]() |
CCL162 | Melting Furnace Modification at Nkana | 07/11/2011 | 15,213 | AMS - II.D " Energy Efficiency and fuel switching measures for industrial facilities" | 10 years | ![]() |
![]() |
CCL193 | Production of biodiesel from non-food oil seeds | 01/10/2012 | 40,054 | ACM0017: Production of biodiesel for use as fuel -Version 2.1.0 , Version 5, Scope 1 and 5 | 10 years | ![]() |
![]() |
CCL198 | Los Andes Photovoltaic Farm | 03/15/2014 | 36,178 | ACM0002: “Grid-connected electricity generation from renewable sources” , Version 14.0, Scope 1 | 7 Years | ![]() |
![]() |
CCL200 | City of Cape Town Treatment of Organic Waste Streams CDM Projects | 07/01/2013 | 49,121 | AMS-III.H.: Methane recovery in wastewater treatment, Version 16.0, Scope 13 AMS-I.C.: Thermal energy production with or without electricity, Version 19.0, Scope 1 | 28 Years | ![]() |
![]() |
CCL221 | West African Biodigester Programme of Activities | 08/29/2013 | 157,931 | AMS-I.E: “Switch from Non-Renewable Biomass for thermal applications by the user, Version 05.0, Scope 1 | 21 Years | ![]() |
![]() |
CCL225 | Empowering DRC communities through the use of Improved Cook Stoves | 07/01/2014 | 24,033 | AMS-II.G Energy efficiency measures in thermal applications of non-renewable biomass, Version 05.0, Scope 3 | 21 Years | ![]() |
![]() |
CCL232 | Fuel Switch at Corobrik’s Driefontein Brick Factory in South Africa | 06/11/2007 | 32,552 | AMS- III.Z. Fuel Switch, process improvement and energy efficiency in brick manufacture, Version 04.0, Scope 4 | 7 Years | ![]() |
![]() |
CCL256 | ACP Thermal Harvesting™ Project | 11/22/2012 | 20,608 | AMS-III.Q “Waste energy recovery (gas/heat/pressure) projects” , Version 5, Scope 4 | 10 years | ![]() |
![]() |
CCL263 | New gas fired power plant at Ressano Garcia | 12/12/2012 | 492,965 | AM0029 " Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas" Version 3.0, Scope 1 | 10 Years | ![]() |
![]() |
CCL278 | Golden Sugar Plc 30MW High Energy Efficient Combined Heat and Power System in Apapa Lagos Nigeria | 07/19/2011 | 59,789 | AM0102 " Greenfield cogeneration facility supplying electricity and steam to a Greenfield Industrial Consumer and exporting excess electricity to a grid and/or project customer(s) " Version 1.0.0, Scope 1 | 10 years | ![]() |
![]() |
CCL288 | Oblogo 1 Landfill Gas Recovery and Flaring Project | 09/30/2011 | 19,919 | AMS-III.G " Landfill methane recovery " Version 09.0, Scope 13 | 10 years | ![]() |
![]() |
CCIPL0365 | Renewable Energy Rural Electrification (RERE) Programme | 01/01/2016 | 7,128 | AMS-I.L Electrification of rural communities using renewable energy, Version 03.0, Scope 1 | 28 Years | ![]() |
![]() |
CCIPL0382 | Small Hydro Power Programme of Activities in Iran | 10/07/2015 | 81,594 | AMS-I.D " Grid connected renewable electricity generation " Version 18.0, Scope 1 | 28 Years | ![]() |
![]() |
CCIPL0389 | SunLighting™ Côte d’Ivoire – Programme to replace kerosene lamps with micro PV LED systems | 07/02/2015 | 59,800 | AMS-III.AR " Substituting fossil fuel based lighting with LED/CFL lighting systems " Version 5.0, Scope 1 | 28 Years | ![]() |
![]() |
CCIPL0390 | La Ferme – Bambous 15 MW solar power farm | 08/01/2013 | 22,226 | ACM0002 " Grid-connected electricity generation from renewable sources " Version 16.0, Scope 1 | 10 years | ![]() |
![]() |
CCIPL0406 | Energy Efficient Building Materials Production Technologies Development Program | 06/02/2013 | 48,658 | AMS-III.Z " Fuel Switch, process improvement and energy efficiency in brick manufacture " Version 6.0, Scope 4 | 28 Years | ![]() |
![]() |
CCIPL0469 | EnKing International Renewable Energy POA | 05/24/2016 | 1,845 | ACM0002 " Grid-connected electricity generation from renewable sources " Version 17.0, Scope 1 AMS-I.F " Renewable electricity generation for captive use and mini-grid " Version 3.0, Scope 1 AMS-I.D " Grid connected renewable electricity generation " Version 18.0, Scope 1 | 28 Years | ![]() |
![]() |
CCIPL0476 | Landfill Gas Capture and Utilization at Ras-Al-Khaimah | 03/30/2017 | 85,619 | ACM0001 " Flaring or use of landfill gas " Version 17.0, Scope 13 | 7 Years | ![]() |
![]() |
CCIPL0484 | Institutional Improved Cook Stoves for Schools and Institutions in Uganda | 03/27/2017 | 30,072 | AMS-II.G " Energy efficiency measures in thermal applications of non-renewable biomass " Version 08.0, Scope 03 | 7 Years | ![]() |
![]() |
CCIPL0501 | Wind Power Project by Wires & Fabriks (EKIESL-CDM.February-15-03) | 05/03/2010 | 3,342 | AMS-I.D " Grid connected renewable electricity generation " Version 18, Scope 01 | 7 Years | ![]() |
![]() |
CCIPL0549 | Royal Swaziland Sugar Corporation Fuel Switch and Cogeneration Projects | 06/15/2010 | 120,751 | ACM0006 " Electricity and heat generation from biomass " Version 13.1, Scope 01 | 7 Years | ![]() |
![]() |
CCIPL0570 | Conversion of Pars 1 power plant from single cycle to combined cycle | 05/31/2014 | 904,733 | ACM0007 "Conversion from single cycle to combined cycle power " Version 06.1.0, Scope 01 | 10 years | ![]() |
![]() |
CCIPL0582 | SHINE – Distribution of LED Lightbulbs in India | 01/08/2018 | 400,040 | AMS-II.C " Demand-side energy efficiency activities for specific technologies " Version 15.0, Scope 3 | 28 Years | ![]() |
![]() |
CCIPL0653 | Replacement of Higher Carbon Fuels by Natural Gas in the Industrial and Power Sector in Nigeria | 11/21/2016 | 0 | AMS-III.B Version 18.0, Scope 3 AMS-III.AN Version 2.0, Scope 3 | 28 Years | ![]() |
![]() |
CCIPL0695 | Viet Nam Clean Water Program | 05/15/2019 | 0 | AMS–III.AV Version 07.0, Scope 3 | 28 Years | ![]() |
![]() |
CCIPL0697 | Clean cooking and safe water programme in India | 05/20/2019 | 0 | AMS–II.G Version 10.0, Scope 3 AMS–III.AV Version 07.0, Scope 3 | 28 Years | ![]() |
![]() |
CCIPL1196 | Nam Pong Hydropower Project (RCP) | 01/14/2011 | 90,816 tCO2e | ACM0002: “Grid-connected electricity generation from renewable sources”, Version 20.0 | 40 Years | ![]() |
![]() |
CCIPL1290 | Bundled Wind Power Project at Rajasthan India | 12/11/2009 | 4,456 tCO2e | AMS I.D.: Grid connected renewable electricity generation (version 18.0) | 20 Years | ![]() |
![]() |